Used Pipe Elevators,Elevators For Drilling Pipe ,Double Latch Elevator For Tubing,Ta Tubing Elevator JIANGSU PETROLEUM MACHINERY CO.,LTD , https://www.jspmgroup.com
Plastic material: PC
Mold Steel: S136
Mould Standard: DME
Injection System: Side gate
Ejector System: Ejector Pin
High quality
Reasonable price
On time delivery
Good After-sale service
Strict quality control
All the mould are automotic.
JSL Mould Quality Control
For the Q/C of mould, there are 3 steps:
1. Mould Material Q/C
- Mould Steel Checking(Hardness, flaw detection)
- Mould Standard Spare Parts Checking(hardness, size, flaw checking)
2. Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- checking each part of mould's size after machining, according to 2D drawing
- mould testing(check mould running condition)
3. Check with customer's requirement again before mould shipping.
Product Name
Injection plastic helmet visor mould
Product material
PC
Core& Cavity Steel
S136
Steel hardness:
HRC48-52
Mould Standard
DME, etc
Cavity Number
Single
Injection System
side gate
Ejector System
ejector pin
mould base
S50C
Â
Cycle Time
30S
Â
Tooling lead time
60DAYS
Mould life
500, 000SHOTS
Quality assurance
ISO9001
Specification
According to client' s requirements
Â
Â
Our Advantage
         1. High quality
         2. Reasonable price          3. On time delivery          4. Good After-sale service          5. Strict quality control          6. All the mould are automotic.
Â
Â
Offer you
In-time response on letters, telephone calls or fax
In-time supply the quotation and mould designs In-time communication on the technical points In-time sending pictures for the mould machining progress and mould finishing schedule In-time mould test and sample delivery In-time mould delivery.
plastic furniture mould1. Samples/Drawing & Requirement from you 2. Mould design: we will Communicate& Exchange the opinion with you after you place order. 3. Material Purchase: Steel cutting and Mould base tooling. 4. Assembling. 5. Inspection of mould: following and controlling the tooling processing. 6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you! 7. Your instruction & confirmation for shipment. 8. Ready made mould before packing.
Â
Â
For more information please contact us.
Â
Model NO.: JSL-N0724-21
Runner: Cold Runner
Design Software: UG
Installation: Fixed
Certification: ISO
Standard: DME
Customized: Customized
Size: According to Customers Requirement
Mould Quality Control: Professional QC
Mould Runner System: Hot or Cold Runner System
Mould Standard: Dme
Mould Design Software: Ug, Proe, Solidworks CAD, Ect
Mould Cooling System: by Experienced Designer
Mould Operating Mode: Automatically by CNC
Mould Base: S50c
Heat Treatment: Nitriding, etc
Trademark: JSLMOULD
Transport Package: High Quality Wooden Case
Specification: DME
Origin: Huangyan, Taizhou, China
HS Code: 8480719090
Injection plastic helmet visor mould