AIR SOURCE SWIMMING POOL HEATER Air Source Swimming Pool Heater,Water Heater Shower,Swimming Pool Air Source Heat Pump,Instant Water Heater Tap Newfair Eco-Energy(Guangdong) Co.,Limited , https://www.newfairecoenergy.com
M Post Three Waves Highway Guardrail Roll Forming Machine
Highway guardrail roll forming machine
Guardrail roll forming machine
Roll forming machine
PLC control touch screen operation
Hydraulic press for punching
High quality competitive price
Forming processing
Uncoiler--- flatting --- punch --- fast feeding --- opto-electrical cutting --- forming --- alignment device --- collection --- controller --- forming moulds
Unit performance:
1, Total power of equipment is 90kw
2, Maximum height of profiles formed: 85mm
3, Maximum thickness: 4.0mm
4, Maximum forming speed: 15m/min
5, The welding machine body structure must conform to the requirement, the welding must conform to the national welding standard.
6, The equipment after antirust processing, brush antirust paint first, the antirust paint must cover comprehensively, then brush the high quality finish paint. The movable part shows the different color for caution.
Equipment parameter:
1 De-coiler
1) The un-coiler with bipyramid and tension power,
2 Loading 8T. Inner diameter of coil: φ 508mm,
3) Maximum diameter of coil: φ 2000mm,
4) Power of tension power: 2.2kw,
2, Flatting machine
1) The wall plate type seven roller flatter, two rollers clamp deliver, five rollers for leveling.
2) Power: 7.5kw,
3, Punching machine
1) Using type Yl32-315 4Â pillar hydraulic pressure puching machine,
2) Hydraulic pressure power: 22kw.
3) Material of blade mould &Â plunger chip is alloy steel Cr12MOV.
4, Fast feeding
1 Initiative delivers.
2 The power disposition is the 2.2KW.
3 The reductor is ZQ250.
5, Opto-electrical Cutting device
6, Forming machine:
1) Forming racks: 12sets
2) Cast iron torri type
3) Width of machine: 550mm
4) Material of torri is HT200, tempering
5) Double axis transmission gear box 1set, under the axis transmission gear box 10set, bevel gear modulus M=9, material of gear box is only HT200.
6) Power of main machine: 55kw, transducer speed governor. ZQ650, reductor, speed ratio: 48.57, Between the transmission gear box uses 1Â inch double chain drive; Connects with the rotary drive shaft between rollers, rotary drive shaft model 140-275; Uses 1.5 inch double chain drives with the speed reducer;
7, Collection table
8, Control system
Production line uses PLC controller, opto-electrical device control cutting. But manual and automatic control whole production line for each part coordination.
9, Forming mould:
Material is GCr15. Whole quenching hardness is HRC55 º ~60
Components
decoiler
1 set
guiding and leveling device
1 set
forming machine
1 set
punching device
1 set
cutting device
1 set
electric controll system
1 set
output table
1 set
 driven device--gear box
1 set
Terms
Payment type
35% T/T prepaid and balance should be paid before loading
Delivery time
30days after receving advance payment
Guarantee period
18monthes free service/ pay service all the machine lifeÂ
Installation and training
If buyers visit our factory and check the machine, Â
we will teach you how to install and use the machine, Â
and also train your workers/technician face to face.
Without visiting, we will send you user manual and
video to teach you to install and operate.
If buyer needs our technician to go to your local factory,
please arrange board and lodging and other necessary things.
 Â
Packing and loading photosÂ
Contact:
Abby Song
Â
MOB/:+86-18701854523
TEL: +86-21-67298619
Â
Website:http://shaofa.en.alibaba.com
        http://www.shafjx.com