The die casting process involves the use of a furnace, metal, die casting machine, and die.
The metal, typically a non-ferrous alloy such as aluminium or zinc, is melted in the furnace and then injected into the dies in the die casting machine. After the molten metal is injected into the dies, it rapidly cools and solidifies into the final part, called the casting parts.
The castings that are created in this process can vary greatly in size and weight, ranging from a couple of ounces to 100 pounds. One common application of die-cast parts are housings - thin-walled enclosures, often requiring many ribs and bosses on the interior.
Metal housings for a variety of appliances and equipment are often die cast.
Several automobile components are also manufactured using die casting, including pistons, cylinder heads, and engine blocks. Most home appliances also need lightweight and
Belt Pulley,Wind Impeller,Washing Machine Pulley,Washing Machine Motor Pulley Ningbo Sunlee Electrical Technology Co. , Ltd. , https://www.sunleeelectric.com
Available sizes:
13mmx90 wells
16mmx60 wells
20mmx40 wells
25mmx24 wells
30mmx21 wells
Test tube rack is a laboratory equipment that is used to hold upright multiple test tubes at the same time. It is most commonly used when various different solutions are needed to work with simultaneously, for safety reasons, for safe storage of test tubes, and to ease the transport of multiple tubes.Â
Our warehouse
Packaging Details: Export Cartons
Global delivery
1, Rapid  response is assured.
2, Lead time: within 15 days
Plastic Test Tube Rack With Good Quality And Low Prices
Available sizes:
13mmx90 wells
16mmx60 wells
20mmx40 wells
25mmx24 wells
30mmx21 wells
Test tube rack is a laboratory equipment that is used to hold upright multiple test tubes at the same time. It is most commonly used when various different solutions are needed to work with simultaneously, for safety reasons, for safe storage of test tubes, and to ease the transport of multiple tubes.Â
Our warehouse
Packaging Details: Export Cartons
Global delivery
1, Rapid  response is assured.
2, Lead time: within 15 days
Model NO.: FJ005
Lead Time: 3-14days
Trademark: OEM/ODM
Transport Package: Standard Export Packing
Specification: 100pcs/package
Origin: China
HS Code: 3926909090
Model NO.: FJ005
Lead Time: 3-14days
Trademark: OEM/ODM
Transport Package: Standard Export Packing
Specification: 100pcs/package
Origin: China
HS Code: 3926909090
Plastic Test Tube Rack With Good Quality And Low Prices