Summary of contents: If you do not upgrade, the sewage treatment plant will become a "sewage" plant. Yesterday, the launching ceremony of the Sino-French Ecological Park Economic and Trade Cooperation and the Fourth China-EU Investment and Trade Fair were held in Shenyang. The meeting revealed that Shenyang's four sewage treatment plants are expected to significantly increase the sewage treatment standards.

Sewage treatment plant faces "sewerage"

The first large-scale sewage treatment plant in Shenyang was built in 1998 and is a sewage treatment plant in northern Shenyang. After 13 years of operation, the northern sewage treatment plant is facing an upgrade. The northern sewage treatment plant is designed with a daily treatment capacity of 400,000 tons, of which 200,000 tons will be treated with an ordinary activated sludge process, and treated water will be a secondary standard. If the state again raises the water standard, the northern sewage treatment plant that should have been “pollution-control” will face “drainage”.

This situation has also emerged in the three wastewater treatment plants, namely the Fairyland Sewage Treatment Plant, the Shenshuiwan Sewage Treatment Plant, and the Western Wastewater Treatment Plant. At present, these sewage treatment facilities are all planned to be upgraded and the total investment will reach 1 billion yuan.

2/3 of the city's water is cleaner In this plan, Guodian Northeast Environmental Protection Industry Group plans to upgrade the existing technology. According to relevant sources, according to the new standard, four sewage treatment plants will implement monitoring projects such as nitrogen and phosphorus. After the upgrade, the effluent standards of all the sewage treatment plants will reach the level directly used for landscape water.

It is understood that the total amount of sewage treated by these four sewage treatment plants will reach 1.15 million tons per day, which is equivalent to about 2/3 of the total discharge of sewage in the urban areas of Shenyang City.

Shenyang is building a sludge treatment plant Guodian Northeast Environmental Protection Industry Group is building a sludge plant that processes 1,000 tons per day in the Shenyang Economic and Technological Development Zone to dry the sludge produced by the sewage treatment plant. The content of pollutants in these dirty muds is very complex and contains a variety of hard-to-extract heavy metal elements. If the burial is fully implemented, it will affect the surrounding geological environment of the sludge plant.

Shenyang plans to learn advanced sludge treatment technology from France, extract heavy metals such as copper and lead, and try to “turn waste into treasure”.

PPR Welding Machine

Socket Fusion Welding Machine,Fusion Welding Machine,PPR Welding Machine

Broad Imp. & Exp. Co., Ltd. , http://www.hzweldingmachine.com