Glass Bowl Food Choppers
Glass Bowl Food Choppers are our main food choppers. We have 0.6L, 1.2L, 1.8L optional with pure clear and thick glass bowl. Besides, we have molding polyfoam packing for glass bowl and our glass bowl is thick and strong, it is not easy broken. What's more, glass bowl is easy to clean.
Description of Glass Bowl Food Choppers
300W/350W
S/S housing
pure clear and thick glass bowl with double blades
one/two speeds with safety lock
metal gear
6pcs/ctn
Glass Bowl Food Choppers,Glass Bowl Choppers,Kitchen Food Processor,Vegetable Chopper Flying Electronic Co., Ltd , https://www.flyingelectronic.com
Xi Jinping said to the field engineering and technical personnel that I was very happy and excited to see the Three Gorges Dam today. The country has achieved such great results, and this is also your contribution. If the country is to be strong and the nation wants to revive, we must rely on ourselves to forge ahead and work tirelessly. Barry is only half of 90. The great rejuvenation of the Chinese nation will not be achieved with joy, joy, and drumming. We must rely on our own efforts, and the big country must be in our own hands. It is necessary to promote the ability of independent innovation through self-reliance. Imagine building the Three Gorges Project in the past. If it is all based on introduction and relying on others, how can we lead today? We have been welcoming ourselves to the hardships. We have not only achieved such achievements as the Three Gorges Project, but also cultivated a group of talents. I am proud of you and proud of our country’s ability to do so. I hope that we can work together and work together. More than 1.3 billion Chinese people work together to achieve a Chinese dream.
The Three Gorges shiplift is a heavy-duty vertical ship lift with a rack and pinion. The ship has a scale of 3000t, the maximum lifting height is 113m, and the maximum lifting weight is 15,500 tons. It has the characteristics of large lifting height, large lifting weight, large amplitude of upstream navigation water level and fast change of downstream water level. It is the world's technically difficult and largest ship lift.
After more than six years of hard work, CSSC Heavy Industry Wuhan Company and its team have overcome more than 30 major technical difficulties, completed the manufacturing, installation and commissioning of the Three Gorges shiplift, and promoted China. The complete set of manufacturing, installation and commissioning technology for major equipment has reached the world advanced level.
According to China Shipbuilding Heavy Industry, on the afternoon of April 24, 2018, General Secretary Xi Jinping came to the Three Gorges Dam and climbed the top of the dam. He looked at the upper and lower reaches of the Yangtze River in detail, and learned more about the construction of the Three Gorges Project, power generation, water conservancy, navigation, ecological protection, etc. Aspects of the situation. Subsequently, he went to the on-board investigation of the navigation ship locks and ship lifts developed and built by CSIC, listened to the situation report and watched the ship lift operation. The shiplift technical support team consisting of 15 people from CSIC Wuhan and the factory has carried out technical support work on site.