On the 12th, the 2015 Shenzhen Automobile Incremental Index Allocation Plan and the first phase of the car's incremental indicator bidding announcement were released. On March 10th, Shenzhen will carry out the first car incremental index bidding activity, and allocate 4445 ordinary car indicators by bidding. Before and after the bidding, 4,445 ordinary car indicators and 2,222 electric cars will be allocated by the lottery. Quantity indicator. Bending Machine,Metal Sheet Rolling Machine,Plate Bending Rolls,Roller Bending Machine HT-Metalforming Equipment Manufacturing Co.,Ltd , https://www.htmetalforming.com
This year, 100,000 indicators will be distributed in 11 phases according to the 2015 Shenzhen Small Car Incremental Index Allocation Plan, which was developed by Shenzhen Transportation Committee. This year, Shenzhen will allocate a total of 100,000 indicators (average number of 12 periods). Since the indicators were not delivered in January, and the January indicators were evenly distributed to 2, 3, and 4 months, the final year's indicators were divided into 11 phases. Each of the indicators is configured according to the ordinary car lotion: ordinary car bid: electric car shake number = 4:4:2, and the proportion of individuals and units are 88%, 12%, and the decimal place is rounded off.
According to the above principles, the 1, 2, and 3 phases of the second, third, and fourth months of this year plan to release 11,112 indicators, and the fourth to eleventh phases plan to put 8333 indicators. The actual number of indicators delivered in each period is the sum of the planned amount of the current period, and the sum of the number of incremental indicators that were not successfully configured in the previous period and not used in the previous period. The Shenzhen Municipal Transportation Commission will be in Shenzhen City's small car incremental control management information system (http://xqctk.sztb.gov.cn/) and the Municipal Transportation and Transportation Commission portal (http:/) before each lottery and bidding. /) The number of actual delivery indicators for the current period is announced.
In the first phase of the 11112 car increment index, 4,445 ordinary car increment indicators were allocated to units and individuals in the form of a lottery, including 533 unit indicators and 3912 individual indicators. There are 4445 increment indicators for automobiles, including 533 unit indicators and 3912 individual indicators. 2222 electric bicycle increment indicators are allocated to units and individuals by means of lottery, including 267 unit indicators and 1955 personal indicators.
It is necessary to pay a deposit of 5,000 yuan before the 27th. It is understood that the Shenzhen United Assets and Equity Exchange will be entrusted by the Shenzhen Small Automobile Incremental Regulation Management Department to organize the implementation of the Shenzhen Automobile Incremental Index Bidding Activity. It is reported that the first bid will be held from March 9th to 15th, 2015 on March 10th, 2015. The online bidding method will be used for 6 hours. Units and individuals bid at the same time.
Bidders need to log in to the Shenzhen Small Car Incremental Control Management Information System (http://xqctk.sztb.gov.cn), click on the “Bid Platform†button to log in to the Shenzhen Automobile Incremental Control Bidding Platform, with the qualification of the indicator management agency. The quotation is made after the valid code of the audit confirmation and the mobile phone number filled in at the time of registration are activated.
It is reported that the reserve price of each small car increment indicator in Shenzhen is 10,000 yuan, and the unit or individual participating in the bidding (hereinafter referred to as "the bidder") must not quote the reserve price. The bidder can quote 1 time within the specified time, and has two opportunities for revision of the quotation. The quotation is equal to or higher than the reserve price as a valid quotation, and the quotation above the reserve price should be an integral multiple of 100 yuan. The last valid offer is subject to change.
At the same time, the bidder should log in to the bidding platform from February 12 to 27, 2015 to obtain the special account for the margin corresponding to the bidder, and at the same time select the paying bank and bid to the bidder according to the standard of 5,000 yuan per application. The Margin Special Account pays the Spot Margin in one lump sum.